Learning from aran
The stitches I’m doing:
1. 8-st cables. Three on each side, alternating back cable and front cable.
2. 2-st twist cables. Knitting through the back of the second stitch, then through the front of the first stitch, and dropping both off together. It took me a few tries to get it right, but it makes a [...]
Posted on October 24th, 2006 by Helen
Filed under: Projects | No Comments »

